Friday, May 02, 2014

Bones Blacking II

The front well deck steel is a bit wobbly and water has been collecting in a dip so it was decided that a locker should be installed to add support.  My brilliant anchor brackets have been removed, but I am told they will return….

The locker was built and then an H made in order to drive a wedge underneath to raise the deck to the locker.

P1040479

The kitchen waste has always been a bit small and now the kitchen has been revamped the hole is in the wrong place. So, that was welded up and a new hole put in.  The drill found it hard work  - here it is having a smoking break (the camera didn’t take the picture too well, but look carefully and you can see the smoke!)

P1040475

The surveyor says the hull is in excellent condition! HURRAH