Pages

Friday, May 02, 2014

Bones Blacking II

The front well deck steel is a bit wobbly and water has been collecting in a dip so it was decided that a locker should be installed to add support.  My brilliant anchor brackets have been removed, but I am told they will return….

The locker was built and then an H made in order to drive a wedge underneath to raise the deck to the locker.

P1040479

The kitchen waste has always been a bit small and now the kitchen has been revamped the hole is in the wrong place. So, that was welded up and a new hole put in.  The drill found it hard work  - here it is having a smoking break (the camera didn’t take the picture too well, but look carefully and you can see the smoke!)

P1040475

The surveyor says the hull is in excellent condition! HURRAH

No comments:

Post a Comment